Services / EV infrastructure

EV Charging

Commercial EV charging electrical infrastructure for operational buildings, from supply capacity through to verified charge-point connections.

Commercial EV charging

The charger is part of a complete electrical path.

Upstream supply, protection, cable routes, load conditions and final verification all matter. ElectroLogic supports practical EV charging infrastructure for FM teams, commercial clients and M&E contractors.

Scope of support

Six areas of commercial EV charging support.

Supply capacity & distribution

Assessment support for supplies, distribution arrangements and electrical upgrades for proposed charging infrastructure.

Protective devices

Appropriate circuit protection, local isolation and protective-device arrangements for dedicated charge-point circuits.

Cabling & containment

Maintainable containment routes, cable installation and final-circuit connections across commercial sites.

EV charge points

Electrical installation, connection, alteration and fault support for commercial charge-point equipment.

Load management & metering

Electrical infrastructure for load considerations, metering and agreed management or monitoring connections.

Testing & verification

Inspection, testing, labelling and clear handover records for completed electrical works.

EV charging electrical path

Follow the supply through to a verified charge point.

A commercial charge point is only the visible end of a system that starts with capacity, protection, distribution and a suitable cable route.

Follow the path. Verify the response.

  1. 01

    Supply

    Available upstream capacity and electrical source.

  2. 02

    Protection

    Protective devices and isolation for the dedicated circuit.

  3. 03

    Distribution

    Board arrangement and a practical outgoing route.

  4. 04

    Charger

    Charge-point supply, connection and local equipment.

  5. 05

    Vehicle

    The connected load at the point of use.

  6. 06

    Verification

    Testing, identification and handover evidence.

Operational follow-up

Assess the supply. Install and verify. Record and hand over.

  1. 01

    Assess the supply

    Review distribution, proposed locations, routes, load conditions and operational constraints.

  2. 02

    Install & verify

    Complete agreed infrastructure, charge-point connections and electrical testing.

  3. 03

    Record & hand over

    Provide clear identification, completed-work records and practical next actions.

Discuss your requirements

Considering commercial EV charging?

Tell us about the site, number of chargers and likely usage so the electrical requirements can be reviewed.

Request technical support