Services / Testing

Electrical Testing & Inspection

Commercial electrical inspection, fixed-wire testing and EICR reporting that gives FM and property teams evidence they can act on.

Inspection & verification

Test evidence that leads to practical decisions.

Testing is coordinated around access and agreed isolations, then reported clearly so defects, priorities and remedial planning are easier to manage.

Scope of support

Six areas of commercial electrical verification.

Electrical installation condition reporting

EICRs for commercial installations, with observations recorded clearly.

Circuit testing & verification

Continuity, insulation resistance, polarity and circuit verification where applicable.

Protective devices & RCD testing

Measured checks of RCDs, RCBOs and associated protective arrangements.

Distribution boards & connections

Board condition, identification, protective devices and accessible electrical connections.

Faults, observations & coding

Evidence-led defect identification, observation coding and explanation of the issue found.

Reports & remedial planning

Clear reports, prioritised remedial recommendations and post-remedial verification support.

Verification path

Turn inspection and measurements into useful action.

The value is in connecting the physical condition, the test result and the required next step.

Follow the path. Verify the response.

  1. 01

    Inspect

    Review visible condition and installation arrangement.

  2. 02

    Test

    Take the relevant electrical measurements.

  3. 03

    Compare

    Assess results against the expected protective performance.

  4. 04

    Identify

    Record observations and the condition causing them.

  5. 05

    Record

    Issue clear EICR and supporting findings.

  6. 06

    Action

    Plan remedial work and verification.

Testing coordination

Plan access. Test methodically. Report clearly.

  1. 01

    Agree access & isolations

    Coordinate the programme around occupiers, critical loads and safe testing windows.

  2. 02

    Inspect & verify

    Complete the agreed visual and instrument testing in a controlled sequence.

  3. 03

    Report & prioritise

    Provide usable results and a practical remedial route.

Discuss your requirements

Planning commercial fixed-wire testing?

Share the site, available records and required programme. We can help plan a controlled inspection approach.

Request technical support