Swimming Pool Heating & AHU Heater Battery Fault-Finding

Independent School — City of London

Fault-finding across two separate swimming-pool heating and AHU heater-battery faults, followed by planned replacement and testing of defective high-current switching equipment.

Electrical Fault-FindingHVAC ControlsPlant Room ElectricalHigh-Current Switching
Existing AHU electric heater control panel investigated during fault-finding
Existing AHU heater control panel investigated under operating conditions.

Project context

Site
Independent School — City of London
Sector
Education
Location
Central London

The challenge

Two plant faults. Separate systems. Methodical investigation.

Two separate plant faults required investigation during the initial attendance. The swimming pool was experiencing insufficient water heating, requiring investigation of the heat exchanger and associated heating and control system.

At the same site, a separate fault was present within the AHU electric heater-battery system. The installation incorporated high-current three-phase switching equipment together with multiple contactors, relays and staged control circuits, requiring systematic electrical and controls fault-finding rather than straightforward component replacement.

Investigation & diagnosis

Follow the operating path before replacing equipment.

ElectroLogic carried out electrical and operational checks across the relevant plant and control equipment.

For the AHU heater battery, the existing control panel, power-switching equipment, contactors and associated control circuits were investigated under operating conditions. Current measurements taken during the investigation showed heater loads of approximately 174–177 A.

The investigation identified deterioration and failure of the high-current contactor associated with the heater battery. The condition of the component meant replacement was required.

Clamp meter showing 176.1 amp operational load during AHU heater battery testing
Operational load measurement during AHU heater battery fault-finding.

Remedial works

Planned replacement and operational checks.

A second attendance was arranged specifically to complete the AHU heater-battery remedial work. The defective high-current contactor was removed and replaced.

Existing high-current power connections and associated control wiring were reinstated and checked. Electrical and operational checks were then carried out to confirm correct operation of the repaired switching arrangement.

Dismantled failed high-current contactor removed from an AHU heater control panel
Failed high-current switching equipment removed during remedial works.
Replacement high-current contactor installed in an existing AHU heater control panel
Replacement high-current contactor installed and system prepared for operational testing.

Engineering capability

Electrical and controls experience across connected plant.

HVAC and mechanical plant electrical fault-finding

High-current three-phase switching systems

AHU electric heater-battery controls

Contactors and control relays

Staged heating control systems

Operational current and voltage measurements

Existing and legacy control-panel investigation

Diagnosis before component replacement

Outcome

From diagnosis to completed remedial work.

The project demonstrates ElectroLogic's ability to investigate faults across interconnected electrical, HVAC and mechanical plant systems and to progress from initial diagnosis through to planned remedial works.

Rather than simply replacing components, the work involved understanding the existing control arrangement, taking operational measurements, identifying the failed equipment and completing the required repair.